Concrete Pour Register

β˜…β˜…β˜…β˜…β˜…4.9 out of 5
Β£21.99

All prices include VAT where applicable

πŸ”’ You'll be taken to Gumroad.com to complete your purchase securely. Your Excel file will be delivered instantly to your email after payment.

CompatibilityWindows & Mac
Version1.0
File Size1.4 MB
Last UpdatedMarch 2026
DeliveryInstant digital download via email
LicenceSingle user, lifetime access

Description

The Concrete Pour Register is an all-in-one Excel template for managing every aspect of concrete works on your construction project. From initial pour planning through placement, curing, and strength verification, every stage is captured in a structured register that gives engineers, supervisors, and quality managers full traceability of every cubic metre placed. Each pour record includes date, location, structural element, specified mix design, actual batch ticket details, volume ordered versus volume placed, slump test results, air temperature, concrete temperature, and any admixtures or additions used.

The integrated formwork strike time calculator uses maturity-based methods to determine the earliest safe stripping time based on ambient temperature records and cement type, helping you optimise your formwork cycle without compromising structural safety. Cube test management tracks every set of test cubes from casting through to lab results, with automated strength gain plotting and pass/fail analysis against specified characteristic strengths. Non-conformance logging captures any deviations £€” rejected loads, failed cube results, cold joints, honeycombing £€” with structured fields for description, cause, corrective action, and sign-off.

The quality dashboard provides a project-wide overview with charts showing pour volumes by month, cube test pass rates, supplier performance league tables, non-conformance trends, and weather impact analysis. Supplier performance tracking monitors delivery reliability, ticket accuracy, and concrete quality by batching plant, giving your commercial team data-driven leverage for supplier reviews. Whether you are pouring foundations, slabs, walls, or specialist structures, this register keeps your concrete programme organised, compliant, and transparent.

Key Features

βœ“ Structured pour register with mix design, volumes, and test data
βœ“ Formwork strike time calculator based on maturity and temperature
βœ“ Cube test management with strength gain plotting and pass/fail analysis
βœ“ Non-conformance logging with cause, corrective action, and sign-off
βœ“ Supplier performance tracking by batching plant and delivery reliability
βœ“ Quality dashboard with pour volumes, pass rates, and trend charts
βœ“ Weather and temperature recording for each pour event
βœ“ Slump test and admixture tracking for full batch traceability
βœ“ Automated volume reconciliation: ordered vs placed vs wasted
βœ“ Printable pour records and quality summary reports

Need a Custom Version?

We can adapt any template to match your company's branding, workflows, or reporting requirements.

Get in Touch β†’